Hemet San Jacinto Railroad Club

News

view:  full / summary

June 2015 Meeting Min

Posted by hemetsjmodelrailroad on July 19, 2015 at 2:50 AM Comments comments (0)

 

 

The Foreman, Sam called the meeting to order at 10:35 am at Phil’s club house in Homeland. Board members not present, Jim, the General Foreman, due to vacation. The Minutes from the May meeting were approved by the membership. The Financials for May were, also, read and approved.

The Membership wished to Thank Phil and his wife for putting on a great May meeting at their club house in Homeland. A Good time was had by all.

The Annual Audit was conducted by Larry Fogel and Charles Smith, please see results under separate cover. Books found to be in order and balanced.

Gus Norberg bought a drill, socket and charger for the club, t o be used when needed setting up and taking down or etc.

Phil Carlyle is on the hunt for a locking two drawer cabinet to put all our goodies

Double heading the 400 streamliner by Harland Phillips

Posted by hemetsjmodelrailroad on April 20, 2011 at 5:15 PM Comments comments (1)

Early in my career as a locomotive fireman I was working the extra board. This meant I would be called to work when my turn came up and I was qualified to fire the job. This call was normally two hours before the crew was to report to work. My call on the state was to report to the depot (Milwaukee) as soon as I could. Train number 214 (a "400" from north of Green Bay in route to Chicago) is having diesel trouble and needs to be double headed with a steam engine. This young fireman was in for the ride of his life. Our engine was the largest Pacific type the Chicago and Northwestern Railway had service. We were quickly coupled to the slick diesel and started on our run to Chicago. As we climbed up through Bayview and St. Francis I leaned out of the right gangway and waved my wife and kids. We live near open field mainlines. We picked up speed as be top the grade at Cudahy. What a site that must have been. The big black Pacific locomotive leading the yellow and green "400" with three of her four diesels screaming at maximum speed. The engineer did his required break tests as we approach the first stop at Racine. He just touched the break valve and there is a tug as the train drags breaks. This lets the engineer know that he has breaks and will be able to stop at the next station. The rest of the trip was a blur with another stop at Evanston just north of Chicago. We arrived at the Chicago station the regular engineer climbed down from the diesel to confer with the engineer. They were glad to have completed a very successful trip. The diesel engineer informed us that before we tested our breaks North of racine we were doing 107 mi./h and he rarely exceeded and he rarely exceeded 102 mi./h at that point. Now you know why i miss the thrill of racing down the track on one of those glorious old smoke belching monsters. This was 1949 and we gave up speed rails for freeways!


Rss_feed

Upcoming Events

Saturday, Oct 21 at 10:30 AM - 11:30 AM
Saturday, Nov 18 at 10:30 AM - 11:30 AM
Saturday, Dec 16 at 10:30 AM - 11:30 AM
Saturday, Jan 20 at 10:30 AM - 11:30 AM

Recent Videos

1652 views - 0 comments
1690 views - 2 comments